applications openInstallers & companies
Przemysł energochłonny – OZE (III nabór, NFOŚiGW, Fundusz Modernizacyjny)

Poland: NFOŚiGW opens PLN 348 m loan call for RES and storage at energy-intensive (EU ETS) plants

From 2 November 2026 to 30 April 2027 industrial companies covered by the EU ETS can apply for Modernisation Fund loans of up to 100% of the cost of on-site RES generation with integrated storage; at least 80% of the electricity must be self-consumed and part of the loan can be forgiven.

SupportLoan up to 100% of eligible costs with productivity bonus and partial forgiveness (conditions in programme documentation); call budget PLN 348.5 m
2 Nov 2026 · NFOŚiGW (gov.pl)Details
grant🇵🇱 PL
🇵🇱 PL PolandannouncedInstallers & companies
Zielona Transformacja (Fundusze Norweskie i EOG 2021–2028) – Magazynowanie energii dla rozwoju OZE

Poland: Norway Grants to fund 1–10 MW storage at existing RES plants with up to 65% grants from Q4 2026

NFOŚiGW and the Climate Ministry plan the first calls of the roughly PLN 800 million Zielona Transformacja programme in Q4 2026, including about PLN 83.5 million for medium-scale (1–10 MW) storage integrated with RES installations, with grants of up to 65% and roughly PLN 8.5–10.6 million per project.

SupportGrant up to 65% of costs, approx. PLN 8.5–10.6 m per project (earlier reporting: EUR 0.2–2.5 m); call budget approx. PLN 83.5 m (EUR 20 m)
28 Oct 2026 · Gramwzielone.plDetails
grant🇵🇱 PL
🇵🇱 PL Polandapplications openInstallers & end customers
Przydomowe Magazyny Energii (PME2)

PME2 — successor of Mój Prąd: storage-only grants, applications open since 20 October 2026

NFOŚiGW opened the PLN 1 billion Przydomowe Magazyny Energii (part 2) call on 20 October 2026: refund-type grants for home batteries of at least 10 kWh, heat storage and hybrid inverters, accepted until 1 October 2027 or until the budget runs out.

Support30% of costs, up to PLN 800/kWh; cap PLN 16,000 (net-billing) or PLN 8,000 (net-metering); +PLN 2,000 once for an EU-made battery or hybrid inverter; heat storage 30% up to PLN 1,000; max PLN 19,000 per metering point
20 Oct 2026 · NFOŚiGWDetails
regulation🇵🇱 PL
🇵🇱 PL Polandin forceInstallers & companies
Ustawa o zmianie ustawy o odnawialnych źródłach energii (UD332) – Dz.U. 2026 poz. 1347

Poland: new RES Act lets prosumers add batteries up to 2.2x PV power without capacity summation

The President signed the OZE Act amendment on 15 October 2026 (Dz.U. 2026 poz. 1347): from 1 December 2026 grid operators will not add storage power to micro-installation capacity if the battery does not exceed 2.2 times the PV power and grid export stays within the PV power.

SupportStorage power up to 2.2 x PV power excluded from micro-installation capacity from 1 December 2026
16 Oct 2026 · GLOBEnergiaDetails
loan🇵🇱 PL
🇵🇱 PL PolandclosedInstallers & companies
Energia dla Wsi

Energia dla Wsi — third call (PLN 400 m) opened 1 October 2026 and its budget was exhausted the next day

The third Energia dla Wsi call opened on 1 October 2026 with PLN 400 million and NFOŚiGW declared the budget exhausted the next day; applications are still formally accepted until 31 January 2027 but will be assessed only if the budget is topped up with savings from earlier calls.

SupportPLN 400 m (PLN 260 m grants + PLN 140 m loans): grants up to 65% for hydro/biogas and up to 20% for storage (max PLN 20 m); loans up to 100% for PV, wind, hydro and biogas (max PLN 25 m)
2 Oct 2026 · NFOŚiGWDetails
loan🇵🇱 PL
🇵🇱 PL PolandclosedInstallers & companies
Kredyt ekologiczny (FENG, BGK)

BGK Ecological Loan — fourth call closed 8 January 2026, results published 23 September; no fifth call announced

The fourth Kredyt ekologiczny call (24 October 2025 – 8 January 2026, PLN 350 million) is closed and BGK published its results on 23 September 2026; no fifth call had been announced as of early November 2026.

SupportEcological premium of 15–80% of eligible costs (min. PLN 2 m, max EUR 50 m eligible spending), at least 30% primary-energy saving required
23 Sept 2026 · BGKDetails
grant🇵🇱 PL
🇵🇱 PL Polandin forceInstallers & end customers
Czyste Powietrze

Czyste Powietrze: new rules from 20 July 2026 — mandatory energy audit, PV only bundled with a heat-source replacement

A revised Czyste Powietrze has applied since 20 July 2026: 10% higher unit rates for insulation, windows and doors, 180 days (instead of 120) to settle prefinancing, new exceptions to the 3-year ownership rule, and electric heating other than heat pumps leaves the programme after the 2026 transition period.

SupportThermal-modernisation unit rates +10% from 20 July 2026 (wall insulation up to PLN 275/m², windows up to PLN 1,320/m², external doors up to PLN 2,750/m² at the highest level); heat-pump and PV amounts unchanged
20 Jul 2026 · czystepowietrze.gov.plDetails
grant🇵🇱 PL
🇵🇱 PL PolandclosedInstallers & end customers
Mój Prąd 6.0

Mój Prąd 6.0 closed — the sixth call ended on 12 September 2025

Mój Prąd 6.0 closed on 12 September 2025 and NFOŚiGW ruled out a Mój Prąd 7.0 in March 2026; the transitional PME part 1 call (KPO, PLN 105 million) is also closed and new investments are now supported only through the storage-only PME2 programme.

10 Mar 2026 · mojprad.gov.plDetails

An information digest prepared from official announcements and industry press; conditions change — always check the official source and the date of the entry before advising a customer. Updated 5 Nov 2026.

Equipment for subsidised installations

Modules, batteries and chargers from the Pruszków warehouse with the documents the programmes require (CE/IEC certificates, datasheets, warranty, carbon-footprint declarations). Pallet and container prices after login.

Ask for a project priceReply within 4 working hours

We use essential cookies and — with your consent — analytics and marketing cookies. Cookie policy

Subsidies and support programmes · Tagsonne