Union and SPD are still negotiating the EEG 2027 compromise; the Bundestag vote is now expected in the second week of November 2026, followed by the Bundesrat and EU state-aid approval before 1 January 2027. Systems commissioned by 31 December 2026 keep today's tariff for 20 years.
Subsidies & incentives
Subsidies and support programmes
News on PV, storage and e-mobility incentives by country — for installers and EPC companies and for their end customers. Dates and amounts as published; check the source before quoting.
- 13Country
- 66Subsidies & incentives
- 16applications open
- 5 Nov 2026Published
- loan
- feed-in tariff
- regulation
Germany: Bundesnetzagentur's MiSpeL rules let batteries and EV chargers mix grid power with EEG feed-in
On 1 October 2026 the Bundesnetzagentur adopted the MiSpeL determination: storage systems and charging points may charge from the grid and still receive EEG payments for the green share, either via a quarter-hourly 'Abgrenzungsoption' or a metering-light flat-rate option for PV systems up to 30 kWp.
Germany: KfW 270 — loan for PV and storage from about 4.1% (no federal grant for private systems)
There is no nationwide grant for private PV in 2026; KfW 270 finances up to 100% of costs (incl. storage) with a loan from about 4.11% APR (as of 24 Aug 2026). Apply before purchase, via your bank.
Germany: AgNes draft keeps battery network-charge exemption only for investment decisions before 2027
The Bundesnetzagentur's final AgNes draft of 6 August 2026 introduces new network charges from 1 January 2029. Storage keeps its 20-year exemption only if the final investment decision is taken before the decision is published (planned for 1 January 2027) and the battery is commissioned by 4 August 2029.
Germany: KfW launches 'Erneuerbare Energien Plus' (570) loans for PV and storage sold outside the EEG
Since 18 June 2026 companies of any size can finance PV, other renewable generation and energy storage with KfW loans of up to €150m per project, provided the electricity is not supported under the EEG, KWKG or BEW.
Germany: 0% VAT on PV systems up to 30 kWp — open-ended, batteries included
Since 2023 the supply and installation of PV systems (incl. storage) for households up to 30 kWp carry 0% VAT; income from systems up to 30 kWp is exempt from income tax (§ 3 No. 72 EStG).
An information digest prepared from official announcements and industry press; conditions change — always check the official source and the date of the entry before advising a customer. Updated 5 Nov 2026.
Equipment for subsidised installations
Modules, batteries and chargers from the Pruszków warehouse with the documents the programmes require (CE/IEC certificates, datasheets, warranty, carbon-footprint declarations). Pallet and container prices after login.